What are FAT, SAT and OAT?
What are FAT, SAT and OAT?

FAT is generally conducted before shipment to verify equipment or system functions at the factory. SAT is conducted at the project site to confirm installation, connection and basic operation. OAT evaluates system performance under agreed operational conditions.