ALIGN EVERY DETAIL BEFORE PROJECT COMMITMENT
Phase S6 | Alignment Stage
Renon works with customers to confirm system requirements, project scope, responsibilities, delivery conditions, and commercial expectations.
ALIGN EVERY DETAIL BEFORE  PROJECT COMMITMENT

Building a Shared Understanding Before Execution
During Technical & Commercial Alignment, Renon ensures all parties have a shared understanding of what will be delivered, how the project will be implemented, and what commercial terms apply. By aligning critical details early, potential misunderstandings are minimized, laying a firm foundation for smooth execution.

S6 Clarification and Risk Management
Project Finalization & Execution Planning
Bring technical, commercial, and delivery requirements into alignment by finalizing system specifications, interface conditions, commercial terms, and execution schedules—creating a clear path from confirmed solution to project delivery.
System Alignment
Finalize energy capacity, power ratings, equipment specs, and operational parameters.
Interface Integration
Confirm electrical boundaries, communication protocols (Modbus/SCADA), and site conditions.
Commercial Terms
Align pricing structure, delivery terms (Incoterms), payment schedules, and warranty SLAs.
Schedule & Execution
Define manufacturing lead times, FAT/SAT testing milestones, and delivery timelines.
Detailed Technical & Commercial Coordination
Aligning Every Critical Detail Before Contract Execution
Aligning Every Critical Detail Before Contract Execution
Renon works closely with customers to align system configuration, integration requirements, implementation conditions, project scope, delivery schedules, and commercial terms—reducing execution risks and establishing a clear, coordinated foundation before contract signing.
System Configuration
System Configuration
Energy capacity (kWh/MWh) & power output (kW/MW) BMS/PCS equipment selection & topology System architecture & containerized layout Operating strategy & dispatch logic Modular future expansion provisions
Integration Requirements
Integration Requirements
AC/DC electrical coupling interfaces EMS / SCADA communication protocols (Modbus, CAN) Existing site switchgear & transformer headroom Third-party equipment & PV/gen-set integration Utility interconnection & grid code compliance
Implementation Conditions
Implementation Conditions
Civil concrete pad & site clearance preparation Environmental HVAC & thermal operating bounds Fire safety codes (NFPA 855 / UL 9540A) Factory Acceptance Testing (FAT) protocol Field commissioning & grid energization rules
Project Scope Boundaries
Project Scope Boundaries
Hardware BOM & equipment supply scope Renon engineering & service boundaries Customer & EPC partner responsibilities Third-party contractor interfaces Optional extended O&M service packages
Schedule & Delivery Plan
Schedule & Delivery Plan
Manufacturing lead time & FAT schedule Shipping logistics & Incoterms (FOB/DDP) On-site delivery & civil installation timeline Commissioning, SAT & Commercial Operation Date (COD)
Commercial Terms & SLA
Commercial Terms & SLA
Contract pricing structure & currency Milestone-based payment schedules Warranty duration & battery degradation guarantees Long-term spare parts & O&M service agreements
Next Step: Project Kickoff Preparation
With technical requirements and commercial conditions aligned, the next step is to prepare the project launch by confirming implementation plans, detailed schedules, and execution milestones.
What You Will Receive
Fully Aligned Project Scope

Clear, direct communication channels with assigned Renon engineers and account managers.

Confirmed Technical Requirements

Access to domain specialists who understand your site parameters and provide tailored guidance.

Clear Path Toward Execution

A structured foundation for contract finalization, procurement scheduling, and official project kickoff.